✔
Available
on Grow and Scale
subscriptions 1
Within Teamwork.com, you can see all the changes that have been made to a task in the task history.
In Table view, click the options
button (three dots) on the right side of the
relevant task row and select View
History from the dropdown menu.
In List view, you will first need
to hover over the task to reveal the options
button to the far right of the task.
A quick view panel will open on the right
with a list of all the changes that have been
made to the task.
You will be able to see:
- Which task property was changed (due date,
tags, priority etc.)
- What the old property was and what it was
changed to.
- E.g. If someone changes the board
column a task is associated with, you
will be able to see the previous
column it was in, and the newly
associated column.
- Who made the change
- When the change was made
For each action in the history, you can copy
a link directly to that action by selecting
the circle to the left of the item.
When you go to this link, it will open the
task details screen showing the task history
panel, directing you to that specific action
in the list.
For Pro/Deliver subscription plans
and below, the View
History option on a task will
open a modal with a general activity list
which details when an activity occurred, the
corresponding user, and associated task
list.
Note: This version of
the task history does not include the activity
type.
1. Also
available on legacy
subscriptions: Premium,
Enterprise.