Within Teamwork.com, you can log time to
        tasks and projects when replying to
        project item notification emails.
Note: The ability to interact
        with existing tasks via email is dependent
        on your project
            permissions for
        adding and editing
        tasks. Any
        project
        members with
        the project
            permission to Add
            Tasks can
        interact with
        tasks via
        email. 
If the notification email
        relates to a specific task or a comment on
        a task, the time you submit will be logged
        against that task. Otherwise, it will be
        logged
        against the project itself.
Time log duration
Time entries logged via email
        should be added in square brackets as part
        of your
        reply.
Note: Only one time
            entry will be processed per email
            reply.
Supported time formats
        include:
- [1h]
- [1m]
- [1h 25m]
- [1.5]
- [1:30]
Time log
                description
To set a time log description, add
        the relevant text between curly brackets
        after the duration.
- Format: {This is the
            description
            for the time log}.
- Example: [1.5] {Content
            review}
Tags
You can also set tags to be
        applied to the time log itself once
        logged. These need to be specified within
        the description brackets. 
- Format: {Task description
            text #TagName #[Tag name with multiple
            words]}
- Example: [30m] {Content
            review #Admin #[Content Review]}
Billable time
By default, time logged via email
        will be marked as non-billable. Marking a
        time log as billable needs to be specified
        on a separate line of your reply.
- Format: #billable
- Example:

Note: Billable defaults will
        not be applied when time is logged via
        email.
Email reply
The time duration format will be
            picked up whether
            it is added on the same line as the
            main
            text of your reply or on a new line,
            however the 
#billable preference must be
            set on a separate line in your
            reply.You can also reply with the time log
    details without including comment text.
In the example below, a reply is
    being sent to a notification about a comment
    added to a task.
- Response text: Reviewed and
        approved.
- Time duration: 30
        minutes
- Time description: Content
        review
- Time tags: AdminProduct Marketing
- Billable

Once the reply email is sent, time
    will be logged accordingly in the associated
    project with the specified duration,
    description, tags, and billable
    preference. The main text of the email reply is
    added as a comment on the task.

For more information, see: Logging Time on
        Tasks
                