Within Teamwork Projects, you can bulk update existing time that has been logged on a project.

To edit this, go to the Time tab of the project to view the current time logs.


Click the options menu (three dots) to the top right of the Time area, and choose Bulk Update Time Logs.




Note: Bulk updating time logs is only available when a filter is applied within the Time area.


The bulk update allows you to mark the selected time logs as:

  • Billable
  • Non-billable


Once you have selected the change you want to make, click Update Time Logs to save the changes.

Note: The bulk update will only update the time logs associated with the current filter.